CEO Avatar
SLA Warning: External ERP integration latency exceeded 200ms at 04:00 AM. Crelligent engineers are investigating.
Executive Portal

Service Wallet

Financial Command Center & Resource Allocation

Available Balance
42,500 CRD
42,500,000 NGNHealthy
Current Burn Rate
-2,500 CRD/mo
Based on 3 active deployments
Estimated Runway
17 Months
Approx. 510 days remaining
Value Delivered
₦180M
Projected Annual Ops Savings

Active Resource Allocation

Embedded Behavioural Lead
Wk 4 of 12
-1200 CRD/mo
Sarah J.Last-Mile Routing Resistance
Simulation Lab Compute
Continuous
-800 CRD/mo
System AllocationLogistics Algorithmic Testing
Data Architecture Topology
V2.1
-500 CRD/mo
Blueprint GenerationERP Integration Spec

Transaction Ledger

Last 30 Days
DateDescriptionAmount (CRD)
2026-06-25
Simulation Lab: Scenario Beta-4 Compute
TRX-8821
-150
2026-06-18
Operator Deployment: Sarah J. (Wk 4)
TRX-8820
-300
2026-06-11
Operator Deployment: Sarah J. (Wk 3)
TRX-8819
-300
2026-06-04
Governance Matrix Blueprint Generation
TRX-8818
-500
2026-06-01
Q3 Retainer Deposit
TRX-8817
+25,000
2026-05-28
Initial Diagnostic Engine Scan (9-Dim)
TRX-8816
-1,200
2026-05-25
Account Initialization Deposit
TRX-8815
+20,000
Crelligent AI
ESRE™ Co-PilotOnline
Strategic Advisory AI
Crelligent
Good morning. I've analyzed Apex Logistics' latest telemetry.
Your ESRE Score (+13 pts) is trending up, but the Behavioural Constraint in the last-mile team is currently delaying the Route Optimization Go-Live by an estimated 14 days.
How would you like to proceed?
Calculate the cost of the delay.
Crelligent
Running the financial model based on your current fuel consumption rate and SLA penalty risk...
Impact Analysis
Estimated Fuel Waste (14d)₦4,200,000
SLA Penalty Risk₦1,500,000
Total Cost of Delay₦5,700,000
Deploying a Change Manager costs 8,000 CRD (₦8,000,000) but ensures the ₦180M annualized savings target is hit. Shall I draft the Statement of Work?
ESRE Co-Pilot can make mistakes. Verify strategic recommendations.